Clapham One
U+I Group transform areas of towns and cities into thriving communities and neighbourhoods, with a portfolio of mixed- use regeneration projects within London, the south-east, Manchester and Dublin.
In 2012, together with joint venture partners United House, U+I Group delivered a landmark £80m mixed-use regeneration scheme which has transformed leisure services across two sites in Clapham town centre, south west London.
The Public Private Partnership (PPP) scheme provided Clapham with a new highly-sustainable leisure centre, a state-of-the-art library, a family health centre and high-quality residential accommodation, including affordable housing in partnership with Notting Hill Housing Group.
The PPP deal meant that in the depths of the recession, U+I were able to secure £35 million funding for this important project, including loan funding from the Homes and Communities Agency's Kickstart programme, pre-sell £46 million of the development, and guarantee the London Borough of Lambeth a brand new library and leisure centre funded entirely from the sale of the private sector element of the development.
Mary Seacole House on Clapham High Street was replaced by The Library Building, designed by Studio Egret West. The ground floor and basement is based around an audacious spiral design, connecting to the new health centre, a café, performance space and community rooms, reinforcing the community spirit of the development.
The old Clapham Swimming Pool on Clapham Manor Street was replaced with a brand new sustainable leisure centre designed by LA Architects. Facilities include a 6-lane, 25m swimming pool, a much larger fitness suite, a 4-court sports hall, climbing wall and community rooms. The leisure centre opened to the public in December 2011.
Also located on this site is The Manor Building (19 private homes) and 4 Bicycle Mews (44 affordable homes in partnership with Notting Hill Housing Group) both completed in July/August 2011.
Clapham One was awarded Best Mixed-use Development at the International Property Awards 2011 as well as 11 other awards for its architecture, housing design and the quality of its facilities.
Project data:
- Date acquired: 2007
- Date completed: 2012
- Development value: £80 million
- Architect: Studio Egret West, DLA Architecture, LA Architects, ABIR
- Development partners: London Borough of Lambeth
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Algarve House, Southwark.
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Cockpit Yard.
- Development Securities.
- Mixed-use development.
- Placemaking.
- Preston Barracks, Brighton.
- Public private partnership.
- Regeneration.
- Skipton House project.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|The New]] [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Clapham]]
- U and I Plc - Clapham One
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February